Missouri River Resources Oil Pad Sites

Missouri River Resources Oil Pad Sites

Akana’s team of engineers is providing comprehensive engineering and design support to Missouri River Resources, the Three Affiliated Tribes’ oil company, for development of a multi-well pad site on the Fort Berthold Indian Reservation in the Bakken shale play in North Dakota.

The team is responsible for surveying the pad site, access road, and utility corridor; securing permits to drill; coordinating with responsible regulatory agencies; performing environmental and cultural resources analyses and addressing other NEPA requirements; performing the civil design covering the well pad, access road, and utility corridor; and performing the front-end engineering design (FEED) study, covering electrical, structural, mechanical, and instrumentation and control.

Project Details

Client:
Missouri River Resources
Location:
Fort Berthold Reservation, ND

Services Rendered

  • FEED study
  • Civil, Structural, Mechanical, Electrical Engineering and Design
  • Right-of-Way Acquisition Coordination
  • Drill Permitting
  • NEPA Environmental Assessment
  • Regulatory Agency Coordination
Print Friendly