
Akana was part of the design-build team lead by BNBuilders and included NBBJ that expanded the Yellowhawk facility. It was the first time the team worked together and it was a great success. Working closely with the owner, the facility stayed operational while we added the Elder entrance, lab space, examination rooms for additional services, and storage, all in about a year. We turned the back door into a front door and created a flush transition that is covered from the elements so patients can access the facility as easily as possible. Check out the video to hear what Fares and the team have to say.